shadow1

First Passive House

Passive House Irish Factory


Ireland's first factory built Passive House is built in Clonmel, Co Tipperary. It was manufactured in our factory and erected on site in 2 weeks. The triple glazed windows, electricity conduits and internal Fermacell boards were factory fitted to PassiveHaus standards. The house achieves a PHPP calculation of 11kwh/m2/annum and an Airtightness figure of 0.58/hr at 50Kp which is well within the PassivHaus criteria.

Passive House Irish Factory
Passive House Irish Factory


The walls are insulated with Cellulose Insulation pumped to a 60kg/m3 density, are lined externally with Woodfibre Insulation boards which are plastered directly and lined internally with Fermacell. The house is built on a Passive Slab our PassivHaus certified foundation system making it a Thermal Bridge free construction. The HRV Air will be pre-heated in the Conservatory by a few degrees in the Coldest Winter Days.

Passive House Irish Factory
Passive House Irish Factory

The walls are lined internally with Fermacell and the house is built on a Passive Slab our PassivHaus certified foundation system making it a Thermal Bridge free construction. The HRV Air will be pre-heated in the Conservatory by a few degrees in the Coldest Winter Days.

Seamus O'Loughlin

Passive House Technology:
Ph: 00353 87655 8699
Email: [email protected]